ABB Promotes China's Transportation Development
- July 23, 2021
ABB pre-installed integrated charging stations are widely used in public parking lots, residential buildings, hotels, commercial buildings, and other places. They can be connected to the medium voltage distribution network, and standardized products can be delivered. They can be placed in conventional parking areas and only occupy one parking lot. It can effectively reduce the civil construction cost and project cycle. Plug and play, the pre-tested integrated DC charging station solution can be installed in one day. It uses a pre-designed modular infrastructure solution. The owner can immediately invest in 1 or 2 charging facilities. When more consumers use electric vehicles in the future, the owner can expand the scale at any time. The solution supports cloud-based ABB intelligent online monitoring and remote maintenance, helping to reduce operating costs by up to 55%
DS200TCQAG1B DS200TCQAG1BGE | 3500/25 | 6ES7331-7KB02-0AB0 |
IS220PDIOH1B | 3500/64M | 6ES7-331-7KF02-0AB0 |
IC695ALG808 | 3500/40 | 6ES7331-7SF00-0AB0 |
IC697CMM742 | 3500/50M | 6ES7-332-5HF00-0AB0 |
GE D20EME 526-2100 | 330730-040-01-00 | 6ES7332-8TF01-0AB0 |
IC200ALG260 | 135813-01 | 6ES7336-4GE00-0AB0 |
IC697CMM741 | 330140-XX-XX-10-02-05 | 6ES7341-1CH02-0AE0 |
IC695ACC402 | 3500/22M 138607-01 | 6ES7350-2AH00-0AE0 |
IS200TNH1A | 3500/60 133835-01 | 6ES7392-1AJ00-0AA0 |
DS200DCFBG2BNC | 3500/61 | 6ES7400-1TA01-0AA0 |
IC694ALG221 | 71573 306-EL30 | 6ES7401-2TA01-0AA0 |
IC697MEM715B | 1900/65 | 6ES7407-0KA01-0AA0 |
IC600YB842 | 3500/42M 140734-02 | 6ES7407-0KA02-0AA0 |
IC697MDL340 | 330180-X1-05 | 6ES7407-0KR02-0AA0 |
IS220PPRFH1B | 3500/92 | 6ES7412-2XG00-0AB0 |
HE693STP104 | 330930-060-00-00 | 6ES7412-2XJ05-0AB0 |
IC693BEM331 | 330130-040-01-05 | 6ES7414-1XG02-0AB0 |
MLFLLPL11E1RHL00 | 330130-040-01-00 | 6ES7414-2XG03-0AB0 |
IC670MDL241 | 24583-04 | 6ES7414-4HJ04-0AB0 |